Turnkey Lab Set-Up
GREEN LAB: DESIGNING TO FURNISHING OF LABORATORIES:
Every laboratory, be it for chemical, microbiology, material testing, food testing, virology, Research, etc., has a different design, flow pattern, furniture for optimal maintenance; the only factor that would be common is the energy recovery, day natural light, On-site power systems, water usage efficiency as part of the 21st century green laboratories, encouraged and appreciated by the USEPA
- Energy Recovery for Ventilation Air in Laboratories
- Daylighting in Laboratories
- On-site Power Systems for Laboratories
- Water Efficiency Guide for Laboratories
- Customised Laboratory furniture
CLEAN ROOM SETUP – DESIGNING TO FURNISHING
- In compliance with ISO 14644-1, USP 797 and Standard 209E standards
- Air conditioning (HVAC) & HEPA Filtration system are prioritized in positioning for effective containment of the contamination
- Personnel training and evaluation in aseptic manipulation skills
- Qualification of the facility as per the USFDA requirements.
- Testing and qualify the facility in accordance with the Federal Standard 209 and IEST-RP-CC-006 for particle count, room pressurization and filter leakage tests should be run. Other test dealing with airflow pattern, temperature, humidity, lighting and sound levels